Full Factory Relocation — Joinery Workshop, North East
The Challenge
A long-standing customer was relocating their entire production facility to a larger unit 12 miles away. The workshop contained eight machines including two edgebanders, a beam saw and a CNC drilling unit — all needing to be moved, reinstalled and recommissioned with minimal disruption to their order book.
Our Solution
ILEX planned the move over a single weekend. Machines were disconnected, loaded and transported on the Friday, with reinstallation and electrical reconnection completed on Saturday. By Monday morning, all eight machines were running and production had resumed.
The Result
Two days of downtime. Zero damage to machinery. The customer was able to fulfil all outstanding orders on schedule.